Installation

INSTALLATION INSTRUCTIONS

Installation in 3 easy steps:
1) Screw to stud and complete with plaster boards
2) Plaster and paint
3) Install lighting

Attach the profile to the stud (using suitable screws).

Use All-purpose compound or plaster to fill in gaps between one profile to the other and between adjoining plasterboards.
Primer and paint the wall and/or ceiling.
In order to maximize light returns it is advised to paint the inside of the profile in white.

Install LED strip placing it according to Architect/Lighting Designer instructions or from our Lighting ranges recommendations.
It is recommended to adjust LED strip lights on an aluminum strip base.

Contact us for installation details.